Rechercher

[Jar09] A 4-day or a 3-day workweeks scheduling problem with a given workforce size

Revue Internationale avec comité de lecture : Journal Asia-Pacific Journal of Operational Research, vol. 26(5), pp. 685-696, 2009, (doi:10.1142/S0217595909002419)

Auteurs: F. Jarray

Mots clés: Workforce Scheduling, Maximum Flow, Days-off Scheduling

Résumé: This paper presents an exact decomposition approach for an employee days-off scheduling problem of an homogeneous workforce under serval realistic days-off scheduling constraints. These constraints include the following: (1) each employee is assigned to three or four consecutive days-off per week, (2) each employee is assigned at least four consecutive days-off per month and (3) each employee is assigned at least a weekend off per month. A three-step decomposition method is used to obtain the work assignments while respecting the labor demands and the stated constraints.

Equipe: oc

BibTeX

@article {
Jar09,
title="{A 4-day or a 3-day workweeks scheduling problem with a given workforce size}",
author="F. Jarray",
journal="Asia-Pacific Journal of Operational Research",
year=2009,
volume=26,
number=5,
pages="685-696",
doi="10.1142/S0217595909002419",
}